IBWC American Dam Catwalk Repair
The project included slide gate removal and replacement, which entailed professional lead assessment and remediation services of an existing steel catwalk at the American Dam canal gates, SWPPP (best management practices), Rio Grande water diversion, demolition of existing steel catwalk and concrete weir, furnish and installation of new stainless steel structural steel, grating, galvanized steel handrailing and the installation of (6) new stainless-steel slide gates.
- Categories:
- Institutional
- Completion Date:
- March 2019
- Owner:
- International Boundary and Water Commission
- Location:
- El Paso, TX
- Architect:
- Engineer